• Subtitle
    Subtitle English
    • 1. English
    • 2. Spanish
    • 3. Latin
    • 4. Portugese
    • 5. Italian
    • 6. French
    • 7. German
    • 8. Dutch
    • 9. Russian
    • 10. Japanese
    • 11. Chinese
    • 12. Arabic
  • Subtitle
    Server Local
    • Server Local
    • Apple TV 4K
      Ceas 4K
    • Google Play Movies 4K
      Ceas 4K
    • Fandango At Home 4K
      Ceas 4K
    • Apple TV HD
      Ceas HD
    • Amazon Video HD
      Ceas HD
    • Google Play Movies HD
      Ceas HD
    • Fandango At Home HD
      Ceas HD
    • Apple TV SD
      Ceas SD
    • Google Play Movies SD
      Ceas SD
    • Fandango At Home SD
      Ceas SD
This video option does not contain pop-up windows and the load is optimal, you can watch without cuts.
Studio 60 on the Sunset Strip

1 Sezon
22 Episod

Studio 60 on the Sunset Strip - Season 1 Episode 5 Episodul 5


(117 votes, average: 7.40/ 10)

42 minute 2024 HD

  • Share

During cast rehearsals with Lauren Graham and Sting, a reporter attempts to get the real story on Matt and Harriet. Meanwhile Jordan passes on a tasteless new reality series.

img

Sezon

Similar

  • 2002
    imgS E

    Less than Perfect

    Less than Perfect

    6.90 2002 HD

    Claude Casey moved up in the secretarial world of television news, from temp to the anchor's desk. After her boss hires her full time, Claude...

    img
  • 1970
    imgS E

    Nobody's Watching

    Nobody's Watching

    1 1970 HD

    Nobody's Watching is a television program that was never aired. It originated with and was written by Scrubs creator Bill Lawrence, as well as Neil...

    img
  • 2003
    imgS E

    An American in Canada

    An American in Canada

    1 2003 HD

    Jake Crewe is an American television news host who is forced, after beating up his station manager, to accept a job in Calgary, Alberta as the host...

    img
  • 2018
    imgS E

    Heart Surgeons

    Heart Surgeons

    8.60 2018 HD

    The series revolves around the thoracic surgery department of a hospital.

    img
  • 1989
    imgS E

    A Fine Romance

    A Fine Romance

    5.00 1989 HD

    A Fine Romance is an American comedy-drama series that aired from January 18, 1989 to March 2, 1989. The series was filmed on location at various...

    img
  • 1987
    imgS E

    Roxie

    Roxie

    1 1987 HD

    Roxie is a spin-off of Kate & Allie that aired on CBS from April 1, 1987 to April 8. The sitcom was cancelled after two episodes.

    img
  • 2002
    imgS E

    Good Morning, Miami

    Good Morning, Miami

    6.70 2002 HD

    A talented young TV producer arrives in Miami to revamp the lowest-rated morning show in the country. Jake Silver risks taking the job when he sets...

    img
  • 2001
    imgS E

    Réal-TV

    Réal-TV

    1 2001 HD

    img
  • 2006
    imgS E

    Cake

    Cake

    1 2006 HD

    A teenaged version of Martha Stewart, Cake stars as the host of "CakeTV," a public-access TV program about arts and crafts that is filmed in her...

    img
  • 1998
    imgS E

    LateLine

    LateLine

    1 1998 HD

    LateLine is an American TV sitcom that ran on NBC from March 17, 1998, through March 16, 1999. Due to an abrupt cancellation, there were seven...

    img

Recomandare

  • 2011
    imgS E

    Billy on the Street

    Billy on the Street

    6.60 2011 HD

    Comedian Billy Eichner, unfiltered and unapologetic, hits the streets of New York City to test unsuspecting strangers on their knowledge of music and...

    img
  • 2022
    imgS E

    Lucky!

    Lucky!

    8.80 2022 HD

    The extraordinary story of Bernie Ecclestone's meteoric rise from post-war car dealer to the creation and 50-year reign over the cutthroat world of...

    img
  • 2015
    imgS E

    Texas Rising

    Texas Rising

    6.30 2015 HD

    A chronicle of the Texas Revolution, the uprising against the tyranny of Mexican dictator Santa Anna, from the battle of the Alamo to the battle of...

    img
  • 1999
    imgS E

    Jack & Jill

    Jack & Jill

    7.50 1999 HD

    A lighthearted romantic comedy about post-collegiate life, love and career in New York City.

    img
  • 2013
    imgS E

    Newsreaders

    Newsreaders

    7.38 2013 HD

    Newsreaders is a quarter-hour format American television comedy that lampoons the news magazine genre. The series is a spinoff of the Adult Swim show...

    img
  • 2005
    imgS E

    Run's House

    Run's House

    8.00 2005 HD

    Run's House is an American reality television series that debuted on October 13, 2005. The series chronicles the family life of former...

    img
  • 2008
    imgS E

    Life on Mars

    Life on Mars

    6.50 2008 HD

    After a car crash, police detective Sam Tyler mysteriously finds himself transported back to 1973 and still working as a detective.

    img
  • 2007
    imgS E

    The Dresden Files

    The Dresden Files

    6.92 2007 HD

    A Chicago-based wizard works as a private investigator.

    img
  • 2016
    imgS E

    Private Eyes

    Private Eyes

    7.30 2016 HD

    Ex-pro hockey player Matt Shade irrevocably changes his life when he teams up with fierce P.I. Angie Everett to form an unlikely investigative...

    img
  • 2008
    imgS E

    Sense and Sensibility

    Sense and Sensibility

    7.60 2008 HD

    Marianne Dashwood wears her heart on her sleeve when she falls in love with the charming but unsuitable John Willoughby, ignoring her sister Elinor's...

    img